Project Type
region
  • {{item.name}}

    {{item.city}}
  • Factory Direct Selling

    SEE ALL Factory Direct Selling
    • index_saleIcon_1
      Market
    • index_saleIcon_2
      Measurement
    • index_saleIcon_3
      Material selection
    • index_saleIcon_4
      Design
    • 5-Design-confirmation
      Design confirmation
    • index_saleIcon_6
      Material calculation
    • 7-Rendering
      Rendering
    • 7-Rendering
      Intelligent ERP management system
    • 9-CNC-board-cutting
      CNC board cutting
    • 10-Edge-banding
      Edge banding
    • 11-Hole-drilling-management
      Hole drilling management
    • 13-Sorting-and-trial-assembly
      Sorting and trial assembly
    • 14-Color-repair-and-board-cleaning
      Color repair and board cleaning
    • 15-Packaging
      Packaging
    • 16-Warehousing
      Warehousing
    • 17-Loading
      Loading
    • 18-Installation
      Installation
    index_saleImg_1

    Negotiation


    1.Online consultation-media platform,phone call

    2.Negotiation at our company-make proposal based on requirement

    3.Confirm intention-pay deposit,measurement service appointment

    4.Measurement at site-Designer go to site to measure and discuss, take photo for record

    Measurement

    Measurement


    For kitchen measurement:include the ceiling height, distance between walls, doors(include frame stopper),window height and width(include sill), window to floor/ceiling/wall corner distance, as well radiator, pipes, sockets,switches and drainage location, and exhaust fan outlet diameter

    Material-selection

    Material selection


    Color, material, handle etc, build your dream kitchen

    Design

    Design


    1.Preliminary design-make drawing based on measurements

    2.Discuss for modification-discuss with customer,optimize according to customer's requiement

    3.Confirm drawing-make drawing for water pipe and electric wires based on confirmed drawing

    4.Measure again-After Door frame, wall tiles, flooring, ceiling etc are completed, measurement the twice time

    Design_confirmation

    Design confirmation


    1.Confirm details-making production drawing, customer to confirm color, material, hardwares,sizes.

    2.Sign contract-drawing,quotation,contract,all documents in duplicate,sign and stamp by both sides

    3.Production-lead time is subject to contract

    ERP

    Material calculation


    Enter all measurements in the software, choose house layout, then choosethe color and material you want to creat the house

    effect-picture

    Rendering


    After complete the kitchen rendering, you will get it in PDF format

    ERP2

    Intelligent ERP management system


    The production process is digitized, more efficient and more accurate, and the error rate is kept low in all steps of

    Front-end sales system + SU design software + ERP production system

    One-click output of production data

    The system optimizes the typesetting of CNC, edge banding, hole arrangement, sorting, packaging, hardware and other data

    CNC board cutting


    1. Automatic loading and unloading platform

    2. Straight row 16 tool magazine

    3. Multi size machining

    4. Flexible cutting

    Electronic saw cutting

    1. The system can interface with the order splitting software, with built-in optimization layout, saving materials and reducing waste

    2. Batch cutting: particle board, plywood, MDF, OSB, etc

    Edge_banding

    Edge banding


    1. Door panel: PUR door panel edge sealing

    2. EVA cabinet edge sealing

    3. PET door panel laser edge sealing

    4. 45 degree handleless drawer panel, door panel edge sealing

    Hole drilling management


    1. One processing can complete all six hole positions, achieving fast and efficient drilling and milling work

    2. The screw transmission accuracy is higher, with an error within 0.05-0.1mm, and the cumulative error is small, which is higher than the rack transmission accuracy

    3. Double sided alternating slotting: synchronous alternating slotting of the upper and lower sides, greatly improving production efficiency

    4. Irregular machining: Cooperate with various cutting heads/drills to punch/slot/mill the sheet metal

    Sorting_and_trial_assembly

    Sorting and trial assembly


    1. Sort by order/unit cabinets' number using self-developed ERP system

    2. Print labels for the board which label is missed or damaged to prepare for the next packaging step

    3. To supplement orders with insufficient boards

    4. Trial assembly: After assembly, measure the dimensions of the cabinet and board components, check the hole positions, and compare whether the actual object is relative to the drawings

    Color_repair_and_board_cleaning

    Color repair and board cleaning


    1. Clean the board with board washing water

    2. Check if there are scratches/damages on the boards

    3. Use a color pen to repair the board

    4. Replace the faulty boards

    Packaging

    Packaging


    1. Using the ERP packaging system to scan codes,

    2. Print packaging labels

    3. Packing standard of panel: thick paper+foam+corner protection

    4. Packing standard of fragile glass: thick paper+foam+corner protection+wooden creates

    5. Baking paint packaging standard: thick paper+film covering+foam+corner protection

    Warehousing

    Warehousing


    After packaging, deliver to the finished product warehouse, scan the code, count and enter the warehouse

    Loading

    Loading


    Scan code, count and load

    kitchen-cabinet-installation

    Installation


    Provide professional technical personnel for on-site installation